Toyota Canada

Project Description 1050 Lambs Road, Clarington design build construction management new Eastern Canada parts distribution centre geothermal mechanical system TPO roof with solar energy vertical freight elevators cooler panels, precast, ACM Features 349,300 s.f new facility 322,000 s.f warehouse 22,300 s.f office 5,000 s.f of warehouse viewing catwalks shelf and rack storage mezzanine LEED Gold;… Continue reading Toyota Canada

Meadowvale Distribution Centre

Project Description 3500 Argentia Road, Mississauga large distribution facility Prologis LEED Volume (PLV) program Features 248,850 s.f shell distribution facility pre-cast panel construction 41 dock doors 7″ reinforced concrete floors LEED Silver design by Ware Malcomb

Canada Post

Project Description 310 Ritson Road North, Oshawa SPEC construction construction management letter carrier depot site clean-up of contaminated soils Features 38,000 s.f new delivery center overhead doors designed for high vehicle traffic circulation design by Kingsland Architects Inc

Magellan Aerospace

Project Description 3160 Derry Road East, Mississauga design build a global enterprise providing integrated products to the aerospace industry worldwide environmental clean-up minimal disruption, maintaining full operations during demolition & construction Features 227,000 s.f new facility 85,000 s.f demolition 40,000 s.f office 2-storey interior containment pits x-ray room plasma room cranes design by Global Architect

185 William Smith

Project Description 185 William Smith Drive, Whitby warehouse addition interior alterations design build industrial Features 211,800 s.f 88,450 s.f warehouse addition tenant work later on for 4 units client: KingSett Capital design by K&K Architects

1602 Tricont

Project Description 1602 Tricont Avenue, Whitby warehouse addition interior demolition design build industrial Features 259,800 s.f 41,600 s.f warehouse addition tenant work later on for 4 units client: KingSett Capital design by K&K Architects

3730 Laird Road

default

Project Description 3730 Laird Road, Mississauga 4.64 acre site warehouse addition design build industrial Features 32,031 s.f warehouse shell building tenant work later on for McRae Imaging design by Farid Motamedi Architect Inc.

Prologis Phase II

Project Description 1271 & 1281 Tapscott Road, Scarborough SPEC multi-tenant optional interiors Prologis LEED Volume (PLV) high efficiency building envelope white roof with a high SRI value Features 330,000 s.f 2 buildings, each 165,000 s.f precast construction truck doors, drive-in door EFSR sprinkler system reinforced concrete floors LEED Silver design by Ware Malcomb

FedEx Ship Centre

Project Description 475 Commissioner Street, Toronto located in the Portlands, created by the city of Toronto using landfill warehouse and distribution centre construction management cupolex aerated floor forming system used (20,000 pieces with 60 tons or rebar) traps the ground with methane gas and disburses it through a highly sophisticated ventilation system Features 80,000 s.f… Continue reading FedEx Ship Centre

Debrob Investments

Project Description 428 Jutras Drive South, Windsor design build, CM contract division of Can Art Aluminum new aluminum extrusion plant for automotive industry houses unique industry equipment shipped from Europe tight timeline, completed in less than 9 months Features 170,000 s.f 140,000 s.f warehouse 15,000 s.f office with high-end finishes 15,000 s.f warehouse office with… Continue reading Debrob Investments